Setting up the Projects module

Created by Turbo Support, Modified on Thu, 10 Sep at 1:55 PM by David Costello

Before you run your first project, a few settings decide how the module behaves. Go to AppsProjectsManage.


Turning it on 


Enable the Project Module switches Projects on.



Naming and numbering

  • Use User Defined Project Names — name projects yourself instead of using the automatic number.
  • Last Number — controls the next project number.


The two settings that do the most work


SettingWhat it does
Always create RFQ when importing Project MaterialWhen you import a materials list onto a project, Turbo automatically raises Requests for Quote (RFQs) for it. You import the bill of materials.
When booking in a Goods Receipt linked to a Project, book the stock directly in as MaterialGoods received against a project go straight onto that project as material, rather than into general stock to be transferred later.


Together these are what connect a project to your purchasing without anyone re-keying anything. See Project purchasing: RFQs, orders and goods in.



Your own statuses


Under Statuses, add your own project statuses with a Name and a Display Order. These sit alongside the built-in ones so the project list reflects how your business actually describes a job's progress.



Job Types and FE Codes


Two further tabs let you maintain Job Types (categorising projects) and FE Codes.

FE Codes are Free Entry codes. A project line doesn't have to be a stocked product — Free Entry lets you add the one-off bought-in part, the subcontractor's day, or a cost with no product record, and the FE Codes tab maintains the codes you use for them. Without free entry those costs could end up off-system in a spreadsheet, which is where job costing could go wrong.



Clocking


Automatically clock everyone off after this hour (Evening) — set a time in 24-hour format and Turbo clocks everyone off then. Leave at 0 to disable. This stops a forgotten clock-on running all night.



Trade-specific


Galvanising Cost (Per Tonne) holds a galvanising rate for costing — for fabricators who send work out to be galvanised.



Performance


Preload Product Search when in the Project Edit Screen — you can turn this off if you find the project edit screen slow. 

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article